ARETE AUSTRALIA, KANE CONSTRUCTIONS PTY LTD, Kane Constructions Pty Ltd T/A Arete Australia, KANE CONSTRUCTIONS (QLD) PTY LTD, KANE CONSTRUCTION VIC PTY LTD
Open 105 contracts, 84.00%, Open via SON 6 contracts, 4.80%, Prequalified 2 contracts, 1.60%, limited 12 contracts, 9.60%,
Contracts
Contract Notice Number |
Contract Description |
Total Contract Value |
Agency |
Contract Start Date |
Supplier |
3559993-A5 |
Upgrade Project |
$45,858,830.81 | Department of Defence |
2018-11-09 |
KANE CONSTRUCTIONS PTY LTD |
228592 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$30,104,159.80 | Defence Materiel Organisation |
2009-09-07 |
KANE CONSTRUCTIONS PTY LTD |
252887 |
ELF STAGE 1 LMA & TRW. |
$22,631,653.00 | Department of Defence |
2009-12-18 |
KANE CONSTRUCTIONS PTY LTD |
3513102-A12 |
Refurbishment and Upgrade |
$19,420,834.76 | Department of Defence |
2018-06-08 |
KANE CONSTRUCTIONS PTY LTD |
3513102-A11 |
Refurbishment and Upgrade |
$19,002,301.25 | Department of Defence |
2018-06-08 |
KANE CONSTRUCTIONS PTY LTD |
3513102-A10 |
Refurbishment and Upgrade |
$18,643,247.88 | Department of Defence |
2018-06-08 |
KANE CONSTRUCTIONS PTY LTD |
3637434-A1 |
Project Management and Design Services |
$18,004,493.02 | Department of Defence |
2019-10-28 |
KANE CONSTRUCTIONS PTY LTD |
209306 |
ELF STAGE 1 RAAF BASE RICHMOND - 37SQN & 1AOSS HEAD CONTRACT (DESIGN AND CONSULTANCY/ELF STAGE 1 |
$11,275,000.00 | Department of Defence |
2009-07-17 |
KANE CONSTRUCTIONS PTY LTD |
118962 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$10,945,005.50 | Department of Defence |
2008-08-25 |
KANE CONSTRUCTIONS PTY LTD |
2752141 |
Head Contractor |
$8,356,797.90 | Department of Defence |
2014-12-01 |
KANE CONSTRUCTIONS PTY LTD |
3712234 |
Construction Services for Parkville Relocation Project |
$8,327,810.52 | CSIRO |
2020-08-14 |
Kane Constructions Pty Ltd T/A Arete Australia |
153159 |
ALTC SUPPLY TRAINING WING BANDIANA |
$6,861,433.70 | Department of Defence |
2009-01-13 |
KANE CONSTRUCTIONS PTY LTD |
3321194 |
Construction Services |
$5,461,324.00 | Department of Defence |
2016-02-01 |
KANE CONSTRUCTIONS PTY LTD |
338484 |
Design and construction for Asia Pacific Military Law Centre project |
$5,061,696.20 | Department of Defence |
2010-09-30 |
KANE CONSTRUCTIONS PTY LTD |
365493-A1 |
Head Contractor Works Brisbane. |
$4,555,306.54 | Australian Securities and Investments Commission |
2011-01-01 |
Kane Constructions Pty Ltd |
214100 |
Fort Direction - Explosive Storage Upgrade |
$4,322,404.90 | Department of Defence |
2009-07-20 |
KANE CONSTRUCTIONS PTY LTD |
215060 |
HOLSWORTHY:SPECIAL OPERATIONS WORKING ACCOMMODATIO AND BASE REDEVELOPMENT STAGE 1 |
$4,012,858.30 | Department of Defence |
2009-07-31 |
KANE CONSTRUCTIONS PTY LTD |
3684788-A2 |
Refurbishment |
$3,904,719.73 | Department of Defence |
2020-05-24 |
KANE CONSTRUCTIONS PTY LTD |
3684788 |
Refurbishment |
$3,813,830.90 | Department of Defence |
2020-05-24 |
KANE CONSTRUCTIONS PTY LTD |
3652122-A6 |
Construction Services for Building 201 Upgrade, Clayton |
$3,052,281.46 | CSIRO |
2019-12-19 |
Kane Constructions Pty Ltd T/A Arete Australia |
2821952 |
Tilt Table Construction |
$2,898,058.90 | Department of Defence |
2015-01-14 |
KANE CONSTRUCTIONS PTY LTD |
375595 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$2,087,676.15 | Department of Defence |
2011-03-28 |
KANE CONSTRUCTIONS PTY LTD |
3425848 |
Refurbishment Works |
$1,929,834.50 | Department of Defence |
2017-05-17 |
KANE CONSTRUCTIONS PTY LTD |
265493 |
ELF STAGE 1 RAAF BASE RICHMOND - 37SQN & 1AOSS HEAD CONTRACT (DESIGN AND CONSULTANCY/ELF STAGE 1 |
$1,652,326.69 | Department of Defence |
2010-03-02 |
KANE CONSTRUCTIONS PTY LTD |
3495915-A1 |
Building and Construction Services |
$1,513,248.28 | Department of Industry, Innovation and Science |
2018-04-09 |
ARETE AUSTRALIA |
3489073 |
Maintenance Works |
$1,509,887.50 | Department of Defence |
2018-02-02 |
KANE CONSTRUCTIONS PTY LTD |
353604 |
ELF STAGE 1 LMA & TRW. |
$1,382,702.08 | Department of Defence |
2010-01-28 |
KANE CONSTRUCTIONS PTY LTD |
345180 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$1,191,288.99 | Department of Defence |
2010-11-05 |
KANE CONSTRUCTIONS PTY LTD |
364991 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$1,176,332.19 | Department of Defence |
2011-02-10 |
KANE CONSTRUCTIONS PTY LTD |
3422798 |
Staff accommodation redevelopment in order to reduce lease costs. |
$1,166,988.82 | National Museum of Australia |
2017-05-01 |
Kane Constructions Pty Ltd |
166900 |
HERITAGE INFRASTRUCTURE WORKS CONTRACTOR KANE |
$1,089,722.70 | Department of Defence |
2009-03-06 |
KANE CONSTRUCTIONS PTY LTD |
238883 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$1,041,259.27 | Department of Defence |
2009-06-22 |
KANE CONSTRUCTIONS PTY LTD |
3381097 |
Construct Facilities |
$698,324.00 | Department of Defence |
2016-09-27 |
KANE CONSTRUCTIONS PTY LTD |
262187 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$686,942.46 | Department of Defence |
2010-02-19 |
KANE CONSTRUCTIONS PTY LTD |
685751 |
Progress Claim 6 Brisbane Fitout Invoice 1559C006 |
$577,692.38 | Fair Work Commission |
2012-06-25 |
KANE CONSTRUCTIONS (QLD) PTY LTD |
3391787 |
Remediation Works |
$553,350.18 | Department of Defence |
2016-11-30 |
KANE CONSTRUCTIONS PTY LTD |
228531 |
ELF STAGE 1 RAAF BASE RICHMOND - 37SQN & 1AOSS HEAD CONTRACT (DESIGN AND CONSULTANCY/ELF STAGE 1 |
$507,685.75 | Defence Materiel Organisation |
2009-09-16 |
KANE CONSTRUCTIONS PTY LTD |
3373098 |
Remediation Works |
$487,128.40 | Department of Defence |
2016-08-17 |
KANE CONSTRUCTIONS PTY LTD |
3331274 |
Storm Damage Remediation |
$463,169.30 | Department of Defence |
2016-03-23 |
KANE CONSTRUCTIONS PTY LTD |
149517 |
Construction Management Services |
$460,921.00 | Department of Foreign Affairs and Trade |
2008-04-01 |
KANE CONSTRUCTIONS PTY LTD |
347701-A1 |
Construction works for Fort Direction - Explosive Storage Upgrade |
$431,325.40 | Department of Defence |
2010-04-29 |
KANE CONSTRUCTIONS PTY LTD |
302194 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$349,093.80 | Department of Defence |
2010-03-23 |
KANE CONSTRUCTIONS PTY LTD |
445470 |
Delivery of new facilities for training capability |
$343,723.49 | Department of Defence |
2011-11-10 |
KANE CONSTRUCTIONS PTY LTD |
215142 |
ALTC SUPPLY TRAINING WING BANDIANA |
$338,890.04 | Department of Defence |
2009-08-06 |
KANE CONSTRUCTIONS PTY LTD |
433259 |
ELF STAGE 1 LMA & TRW. |
$333,585.77 | Department of Defence |
2011-09-22 |
KANE CONSTRUCTIONS PTY LTD |
395731 |
ELF STAGE 1 LMA & TRW. |
$305,037.67 | Department of Defence |
2011-03-18 |
KANE CONSTRUCTIONS PTY LTD |
3155402 |
Head Contractor |
$302,683.70 | Department of Defence |
2015-06-10 |
KANE CONSTRUCTIONS PTY LTD |
3283924 |
Head Contractor |
$295,204.80 | Department of Defence |
2015-08-03 |
KANE CONSTRUCTIONS PTY LTD |
511132 |
Bris Fitout prog claim 4 INV 1559C004 Job 1559 |
$288,607.67 | Fair Work Australia |
2012-04-05 |
KANE CONSTRUCTIONS (QLD) PTY LTD |
428397 |
Fort Direction - Explosive Storage Upgrade |
$286,406.40 | Department of Defence |
2011-06-08 |
KANE CONSTRUCTIONS PTY LTD |
451522 |
Fort Direction - Explosive Storage Upgrade |
$279,457.20 | Department of Defence |
2011-10-05 |
KANE CONSTRUCTIONS PTY LTD |
685761 |
Progress claim 5, Brisbane fitout |
$278,527.61 | Fair Work Commission |
2012-05-14 |
KANE CONSTRUCTIONS (QLD) PTY LTD |
451528 |
Delivery of new facilities for training capability |
$263,548.89 | Department of Defence |
2011-12-09 |
KANE CONSTRUCTIONS PTY LTD |
3503358 |
EST01175 EWP Land |
$262,260.90 | Department of Defence |
2018-04-24 |
KANE CONSTRUCTIONS PTY LTD |
257642 |
Fort Direction - Explosive Storage Upgrade |
$240,474.30 | Department of Defence |
2010-02-01 |
KANE CONSTRUCTIONS PTY LTD |
346141 |
ELF STAGE 1 RAAF BASE RICHMOND - 37SQN & 1AOSS HEAD CONTRACT (DESIGN AND CONSULTANCY/ELF STAGE 1 |
$232,516.73 | Department of Defence |
2010-11-09 |
KANE CONSTRUCTIONS PTY LTD |
461311 |
Brisbane refurb claim 1 job# 1559 inv: 1559C001 |
$228,253.25 | Fair Work Australia |
2012-01-25 |
KANE CONSTRUCTIONS (QLD) PTY LTD |
353031 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$224,720.78 | Department of Defence |
2010-12-10 |
KANE CONSTRUCTIONS PTY LTD |
511142 |
Progress claim 3 Brisbane refit Invoice 1559C003 |
$216,122.51 | Fair Work Australia |
2012-03-07 |
KANE CONSTRUCTIONS (QLD) PTY LTD |
511152 |
Prog claim 2 FWA Brisbane Fitout INV 1559C002 |
$215,579.80 | Fair Work Australia |
2012-02-15 |
KANE CONSTRUCTIONS (QLD) PTY LTD |
264194 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$213,040.30 | Department of Defence |
2010-03-01 |
KANE CONSTRUCTIONS PTY LTD |
39310 |
ASC project |
$211,569.60 | Department of Defence |
2007-04-18 |
KANE CONSTRUCTION VIC PTY LTD |
243278 |
HOLSWORTHY:SPECIAL OPERATIONS WORKING ACCOMMODATIO AND BASE REDEVELOPMENT STAGE 1 |
$211,063.67 | Department of Defence |
2009-11-18 |
KANE CONSTRUCTIONS PTY LTD |
3291351 |
Head Contractor |
$204,576.90 | Department of Defence |
2015-08-28 |
KANE CONSTRUCTIONS PTY LTD |
18833 |
HOLSWORTHY : 171 SQUADRON RELOCATION. (GAPS ID: 1651139) |
$202,063.51 | Department of Defence |
2007-02-22 |
KANE CONSTRUCTION VIC PTY LTD |
250011 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$194,910.51 | Department of Defence |
2009-12-08 |
KANE CONSTRUCTIONS PTY LTD |
198760 |
HERITAGE INFRASTRUCTURE WORKS CONTRACTOR KANE |
$192,554.97 | Department of Defence |
2009-06-25 |
KANE CONSTRUCTIONS PTY LTD |
250218 |
Fort Direction - Explosive Storage Upgrade |
$181,636.40 | Department of Defence |
2009-12-16 |
KANE CONSTRUCTIONS PTY LTD |
3415442 |
Remediation Works |
$179,197.21 | Department of Defence |
2017-03-28 |
KANE CONSTRUCTIONS PTY LTD |
578862 |
Delivery of new ARMY Facilities to meet the requriement of the Enhanced Land Force training |
$169,654.84 | Department of Defence |
2012-06-01 |
KANE CONSTRUCTIONS PTY LTD |
1056641 |
Progress claim 7 Brisbane fitout inv # 1559C007 |
$166,163.45 | Fair Work Commission |
2012-09-20 |
KANE CONSTRUCTIONS (QLD) PTY LTD |
3491857 |
Building Refurbishment |
$153,646.35 | Department of Defence |
2017-12-12 |
KANE CONSTRUCTIONS PTY LTD |
235686 |
ALTC SUPPLY TRAINING WING BANDIANA |
$148,235.86 | Department of Defence |
2009-10-12 |
KANE CONSTRUCTIONS PTY LTD |
3352570 |
Head Contractor |
$148,080.90 | Department of Defence |
2016-06-17 |
KANE CONSTRUCTIONS PTY LTD |
3350879 |
Project Management and Design |
$141,594.20 | Department of Defence |
2016-06-03 |
KANE CONSTRUCTIONS PTY LTD |
3305257 |
Tilt Table Construction |
$120,692.88 | Department of Defence |
2015-11-11 |
KANE CONSTRUCTIONS PTY LTD |
3343742 |
Power Line Maintenance |
$117,491.00 | Department of Defence |
2016-05-13 |
KANE CONSTRUCTIONS PTY LTD |
409372 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$115,127.02 | Department of Defence |
2011-07-11 |
KANE CONSTRUCTIONS PTY LTD |
282034 |
RELOCATION |
$100,320.00 | Department of Defence |
2010-04-12 |
KANE CONSTRUCTIONS PTY LTD |
265469 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$100,318.62 | Department of Defence |
2010-03-05 |
KANE CONSTRUCTIONS PTY LTD |
331159 |
ELF STAGE 1 LMA & TRW. |
$96,739.11 | Department of Defence |
2010-09-08 |
KANE CONSTRUCTIONS PTY LTD |
3461442 |
Refurbishment Works |
$93,810.33 | Department of Defence |
2017-10-16 |
KANE CONSTRUCTIONS PTY LTD |
270447 |
ALTC SUPPLY TRAINING WING BANDIANA |
$91,736.62 | Department of Defence |
2010-03-29 |
KANE CONSTRUCTIONS PTY LTD |
423492 |
ELF STAGE 1 LMA & TRW. |
$89,100.00 | Department of Defence |
2011-08-17 |
KANE CONSTRUCTIONS PTY LTD |
2907432 |
Additional concrete works |
$84,362.85 | Defence Materiel Organisation |
2015-02-24 |
KANE CONSTRUCTIONS PTY LTD |
139067 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$79,800.06 | Department of Defence |
2008-11-18 |
KANE CONSTRUCTIONS PTY LTD |
260492 |
ALTC SUPPLY TRAINING WING BANDIANA |
$78,048.26 | Department of Defence |
2009-11-30 |
KANE CONSTRUCTIONS PTY LTD |
237503 |
ELF STAGE 1 RAAF BASE RICHMOND - 37SQN & 1AOSS HEAD CONTRACT (DESIGN AND CONSULTANCY/ELF STAGE 1 |
$77,938.76 | Department of Defence |
2009-10-21 |
KANE CONSTRUCTIONS PTY LTD |
3498008 |
Building Refurbishment |
$72,879.40 | Department of Defence |
2018-04-12 |
KANE CONSTRUCTIONS PTY LTD |
459694 |
Delivery of new facilities for training capability |
$68,080.10 | Department of Defence |
2012-01-17 |
KANE CONSTRUCTIONS PTY LTD |
159497 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$66,135.75 | Department of Defence |
2009-02-12 |
KANE CONSTRUCTIONS PTY LTD |
276597 |
HOLSWORTHY:SPECIAL OPERATIONS WORKING ACCOMMODATIO AND BASE REDEVELOPMENT STAGE 1 |
$64,798.80 | Department of Defence |
2010-04-12 |
KANE CONSTRUCTIONS PTY LTD |
407163 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$61,419.60 | Department of Defence |
2011-06-27 |
KANE CONSTRUCTIONS PTY LTD |
362081 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$59,865.61 | Department of Defence |
2011-01-27 |
KANE CONSTRUCTIONS PTY LTD |
3291354 |
Tilt Table Construction |
$58,438.60 | Department of Defence |
2015-08-10 |
KANE CONSTRUCTIONS PTY LTD |
392929 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$54,347.70 | Department of Defence |
2011-05-24 |
KANE CONSTRUCTIONS PTY LTD |
180612 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$53,719.00 | Department of Defence |
2009-04-20 |
KANE CONSTRUCTIONS PTY LTD |
347751 |
WEST HEAD GUNNERY RANGE: REDEVELOPMENT |
$49,239.30 | Department of Defence |
2010-04-28 |
KANE CONSTRUCTIONS PTY LTD |
282010 |
H320 AIRCRAFT FUEL TANK VENTILATION SYSTEM |
$47,781.80 | Department of Defence |
2010-04-12 |
KANE CONSTRUCTIONS PTY LTD |
428380 |
Design and construction for Asia Pacific Military Law Centre project |
$47,770.80 | Department of Defence |
2011-08-25 |
KANE CONSTRUCTIONS PTY LTD |
365005 |
HOLSWORTHY:SPECIAL OPERATIONS WORKING ACCOMMODATIO AND BASE REDEVELOPMENT STAGE 1 |
$45,135.20 | Department of Defence |
2011-02-09 |
KANE CONSTRUCTIONS PTY LTD |
3288141 |
Head Contractor |
$41,034.40 | Department of Defence |
2015-08-21 |
KANE CONSTRUCTIONS PTY LTD |
240814 |
ELF STAGE 1 RAAF BASE RICHMOND - 37SQN & 1AOSS HEAD CONTRACT (DESIGN AND CONSULTANCY/ELF STAGE 1 |
$40,285.49 | Department of Defence |
2009-11-06 |
KANE CONSTRUCTIONS PTY LTD |
3309534 |
Head Contractor |
$38,618.80 | Department of Defence |
2015-11-30 |
KANE CONSTRUCTIONS PTY LTD |
353699 |
HOLSWORTHY:SPECIAL OPERATIONS WORKING ACCOMMODATIO AND BASE REDEVELOPMENT STAGE 1 |
$37,719.00 | Department of Defence |
2010-05-18 |
KANE CONSTRUCTIONS PTY LTD |
3468252 |
Refurbishment Works |
$37,370.70 | Department of Defence |
2017-11-06 |
KANE CONSTRUCTIONS PTY LTD |
3303775 |
Head Contractor |
$32,714.00 | Department of Defence |
2015-11-03 |
KANE CONSTRUCTIONS PTY LTD |
428367 |
ELF Stage 1 Puckapunyal - School of Armor (SOArmd) Head Contractor - Kane Constructions - Delivery |
$31,970.40 | Department of Defence |
2011-08-24 |
KANE CONSTRUCTIONS PTY LTD |
226425 |
Fort Direction - Explosive Storage Upgrade |
$31,612.90 | Department of Defence |
2009-09-07 |
KANE CONSTRUCTIONS PTY LTD |
368793 |
Design and construction for Asia Pacific Military Law Centre project |
$30,430.40 | Department of Defence |
2011-02-23 |
KANE CONSTRUCTIONS PTY LTD |
314702 |
ELF STAGE 1 LMA & TRW. |
$26,620.00 | Department of Defence |
2010-07-21 |
KANE CONSTRUCTIONS PTY LTD |
35236 |
Head Contractor |
$26,560.60 | Department of Defence |
2005-02-21 |
KANE CONSTRUCTION VIC PTY LTD |
3356016 |
Building Works - HV Switch Investigations |
$24,021.80 | Department of Defence |
2016-06-15 |
KANE CONSTRUCTIONS PTY LTD |
3321207 |
Head Contractor |
$16,080.90 | Department of Defence |
2016-02-09 |
KANE CONSTRUCTIONS PTY LTD |
354579 |
ALTC SUPPLY TRAINING WING BANDIANA |
$15,757.83 | Department of Defence |
2010-10-18 |
KANE CONSTRUCTIONS PTY LTD |
338412 |
ELF STAGE 1 RAAF BASE RICHMOND - 37SQN & 1AOSS HEAD CONTRACT (DESIGN AND CONSULTANCY/ELF STAGE 1 |
$14,844.50 | Department of Defence |
2010-10-11 |
KANE CONSTRUCTIONS PTY LTD |
440402 |
ELF STAGE 1 LMA & TRW. |
$14,375.62 | Department of Defence |
2011-10-20 |
KANE CONSTRUCTIONS PTY LTD |
3305222 |
Head Contractor |
$13,641.10 | Department of Defence |
2015-11-12 |
KANE CONSTRUCTIONS PTY LTD |
490591 |
Delivery of new facilities for training capability |
$12,640.08 | Department of Defence |
2012-03-14 |
KANE CONSTRUCTIONS PTY LTD |
172868 |
ALTC SUPPLY TRAINING WING BANDIANA |
$12,382.59 | Department of Defence |
2009-04-08 |
KANE CONSTRUCTIONS PTY LTD |
3384626 |
Head Contractor |
$12,322.20 | Department of Defence |
2016-10-27 |
KANE CONSTRUCTIONS PTY LTD |
375581 |
ALTC SUPPLY TRAINING WING BANDIANA |
$12,141.38 | Department of Defence |
2011-02-15 |
KANE CONSTRUCTIONS PTY LTD |
260462 |
HOLSWORTHY:SPECIAL OPERATIONS WORKING ACCOMMODATIO AND BASE REDEVELOPMENT STAGE 1 |
$11,674.08 | Department of Defence |
2010-02-04 |
KANE CONSTRUCTIONS PTY LTD |
234022 |
Fort Direction - Explosive Storage Upgrade |
$10,613.90 | Department of Defence |
2009-10-12 |
KANE CONSTRUCTIONS PTY LTD |
3341649 |
Storm Damage Remediation |
$10,582.00 | Department of Defence |
2016-05-11 |
KANE CONSTRUCTIONS PTY LTD |