Num Month/Year Total Contracts Value Number of Contracts
1900-1January 1900$58,264.85(3 contracts)
1971-4April 1971$25,333.00(1 contracts)
1971-12December 1971$17,077.76(1 contracts)
1972-1January 1972$42,207,107.31(2 contracts)
1977-12December 1977$228,057.58(1 contracts)
1978-10October 1978$43,652.92(1 contracts)
1979-7July 1979$49,794,897.36(1 contracts)
1980-1January 1980$64,680.00(1 contracts)
1981-1January 1981$173,492.51(1 contracts)
1981-12December 1981$21,585.45(1 contracts)
1982-2February 1982$1,839,368.95(1 contracts)
1982-11November 1982$62,098.58(1 contracts)
1986-1January 1986$49,566,000.00(1 contracts)
1986-2February 1986$61,360.62(1 contracts)
1986-7July 1986$57,210.00(1 contracts)
1989-6June 1989$36,468.15(1 contracts)
1990-11November 1990$153,782.20(1 contracts)
1991-1January 1991$31,400.00(2 contracts)
1991-3March 1991$3,453,530.00(1 contracts)
1991-7July 1991$42,645,000.00(1 contracts)
1991-9September 1991$1,081,176.60(1 contracts)
1991-12December 1991$1,783,175.97(1 contracts)
1992-8August 1992$15,359,410.71(1 contracts)
1992-9September 1992$7,576,300.00(1 contracts)
1993-1January 1993$13,761,139.90(1 contracts)
1993-7July 1993$1,119,474.29(1 contracts)
1993-9September 1993$6,242,400.00(1 contracts)
1993-11November 1993$8,598,506.26(1 contracts)
1994-1January 1994$350,815.00(4 contracts)
1994-6June 1994$120,000.00(1 contracts)
1994-11November 1994$14,223,049.42(1 contracts)
1995-4April 1995$19,574.76(1 contracts)
1995-5May 1995$43,608,426.01(30 contracts)
1995-6June 1995$3,000,000.00(1 contracts)
1995-7July 1995$131,000.00(2 contracts)
1995-8August 1995$11,201,406.85(2 contracts)
1995-9September 1995$65,000.00(1 contracts)
1995-10October 1995$7,685,682.99(1 contracts)
1995-12December 1995$4,924,056.39(1 contracts)
1996-1January 1996$26,126,549.91(5 contracts)
1996-2February 1996$2,651,840.04(3 contracts)
1996-3March 1996$14,708,050.08(1 contracts)
1996-5May 1996$13,543,473.43(2 contracts)
1996-6June 1996$10,143,589.16(2 contracts)
1996-8August 1996$3,225,300.00(1 contracts)
1996-10October 1996$89,000,000.00(1 contracts)
1996-11November 1996$54,090.10(1 contracts)
1996-12December 1996$390,800.00(1 contracts)
1997-1January 1997$36,346,727.51(5 contracts)
1997-3March 1997$1,214,808.92(1 contracts)
1997-6June 1997$355,025.68(1 contracts)
1997-7July 1997$5,003,341.19(2 contracts)
1997-10October 1997$2,313,960.00(3 contracts)
1997-11November 1997$76,738,212.00(4 contracts)
1997-12December 1997$2,220,897.94(15 contracts)
1998-1January 1998$43,788,915.81(3 contracts)
1998-2February 1998$21,595.75(1 contracts)
1998-3March 1998$35,328,953.41(5 contracts)
1998-4April 1998$310,991,163.45(1 contracts)
1998-5May 1998$29,235,458.10(7 contracts)
1998-6June 1998$14,618,127.53(2 contracts)
1998-7July 1998$485,238,398.09(7 contracts)
1998-8August 1998$20,809,690.49(2 contracts)
1998-10October 1998$340,000.00(1 contracts)
1998-11November 1998$6,235,770.70(1 contracts)
1999-1January 1999$5,808,032.95(3 contracts)
1999-2February 1999$44,160,368.00(1 contracts)
1999-3March 1999$1,174,407.08(2 contracts)
1999-4April 1999$8,321,934.48(2 contracts)
1999-5May 1999$15,269,099.35(1 contracts)
1999-6June 1999$3,303,595,604.45(1 contracts)
1999-7July 1999$22,192,784.22(15 contracts)
1999-8August 1999$712,985.00(1 contracts)
1999-9September 1999$44,107.00(1 contracts)
1999-10October 1999$3,680,514.00(1 contracts)
1999-11November 1999$15,833,885.90(5 contracts)
1999-12December 1999$35,632,171.20(5 contracts)
2000-1January 2000$57,988,825.11(54 contracts)
2000-2February 2000$12,500.00(1 contracts)
2000-3March 2000$1,018,600.86(5 contracts)
2000-4April 2000$4,630,985.00(6 contracts)
2000-5May 2000$744,399,931.10(7 contracts)
2000-6June 2000$81,513,297.02(4 contracts)
2000-7July 2000$72,333,857.57(24 contracts)
2000-8August 2000$21,729,621.60(8 contracts)
2000-9September 2000$22,873,169.15(3 contracts)
2000-10October 2000$54,954,148.80(5 contracts)
2000-11November 2000$48,086,681.16(7 contracts)
2000-12December 2000$180,176,953.63(6 contracts)
2001-1January 2001$25,159,599.31(9 contracts)
2001-2February 2001$193,867,039.21(6 contracts)
2001-3March 2001$17,339,362.02(7 contracts)
2001-4April 2001$24,845,100.55(5 contracts)
2001-5May 2001$12,741,480.87(2 contracts)
2001-6June 2001$1,359,090,232.74(12 contracts)
2001-7July 2001$101,888,613.25(31 contracts)
2001-8August 2001$149,018,964.79(27 contracts)
2001-9September 2001$36,158,592.81(15 contracts)
2001-10October 2001$74,849,610.09(15 contracts)
2001-11November 2001$33,298,089.42(19 contracts)
2001-12December 2001$44,181,408.27(14 contracts)
2002-1January 2002$110,696,854.35(36 contracts)
2002-2February 2002$690,904,491.53(15 contracts)
2002-3March 2002$493,315,843.52(11 contracts)
2002-4April 2002$219,308,884.03(27 contracts)
2002-5May 2002$161,530,758.54(21 contracts)
2002-6June 2002$462,339,342.74(26 contracts)
2002-7July 2002$161,638,315.47(43 contracts)
2002-8August 2002$61,888,441.69(21 contracts)
2002-9September 2002$82,624,526.61(31 contracts)
2002-10October 2002$84,685,367.02(37 contracts)
2002-11November 2002$43,689,126.17(28 contracts)
2002-12December 2002$125,973,866.29(22 contracts)
2003-1January 2003$140,389,253.99(24 contracts)
2003-2February 2003$82,617,205.34(23 contracts)
2003-3March 2003$87,776,932.71(28 contracts)
2003-4April 2003$356,127,829.52(56 contracts)
2003-5May 2003$144,190,167.71(66 contracts)
2003-6June 2003$294,147,242.89(28 contracts)
2003-7July 2003$1,674,959,764.33(100 contracts)
2003-8August 2003$791,339,549.38(36 contracts)
2003-9September 2003$103,943,573.00(93 contracts)
2003-10October 2003$224,343,196.47(42 contracts)
2003-11November 2003$228,103,362.03(54 contracts)
2003-12December 2003$2,163,239,255.13(54 contracts)
2004-1January 2004$246,894,304.86(45 contracts)
2004-2February 2004$113,279,808.75(85 contracts)
2004-3March 2004$207,949,835.03(56 contracts)
2004-4April 2004$1,324,508,863.63(133 contracts)
2004-5May 2004$571,317,656.22(69 contracts)
2004-6June 2004$1,280,019,630.47(101 contracts)
2004-7July 2004$1,445,036,135.17(216 contracts)
2004-8August 2004$640,106,356.87(126 contracts)
2004-9September 2004$173,544,865.02(84 contracts)
2004-10October 2004$323,653,448.52(139 contracts)
2004-11November 2004$593,335,517.53(97 contracts)
2004-12December 2004$2,934,843,611.59(162 contracts)
2005-1January 2005$1,507,954,769.25(1121 contracts)
2005-2February 2005$262,853,115.96(146 contracts)
2005-3March 2005$809,360,394.51(247 contracts)
2005-4April 2005$488,989,847.58(256 contracts)
2005-5May 2005$234,558,833.16(202 contracts)
2005-6June 2005$7,022,985,881.74(212 contracts)
2005-7July 2005$1,636,486,554.61(484 contracts)
2005-8August 2005$846,613,680.84(263 contracts)
2005-9September 2005$2,402,536,279.33(291 contracts)
2005-10October 2005$2,959,907,018.95(348 contracts)
2005-11November 2005$1,280,488,181.51(257 contracts)
2005-12December 2005$1,971,753,615.54(269 contracts)
2006-1January 2006$883,822,488.79(481 contracts)
2006-2February 2006$386,776,685.25(548 contracts)
2006-3March 2006$2,221,044,832.37(366 contracts)
2006-4April 2006$941,729,681.30(354 contracts)
2006-5May 2006$2,646,318,191.55(440 contracts)
2006-6June 2006$3,193,992,877.50(763 contracts)
2006-7July 2006$9,891,833,833.94(1894 contracts)
2006-8August 2006$1,470,675,607.38(1184 contracts)
2006-9September 2006$6,607,068,960.29(769 contracts)
2006-10October 2006$769,830,331.18(945 contracts)
2006-11November 2006$809,434,464.52(867 contracts)
2006-12December 2006$1,157,581,518.31(864 contracts)
2007-1January 2007$463,840,698.73(1320 contracts)
2007-2February 2007$1,512,523,139.86(1130 contracts)
2007-3March 2007$2,680,348,167.35(1549 contracts)
2007-4April 2007$4,367,196,942.23(1666 contracts)
2007-5May 2007$1,668,944,839.82(2954 contracts)
2007-6June 2007$2,664,597,216.67(4897 contracts)
2007-7July 2007$3,204,048,839.93(9623 contracts)
2007-8August 2007$1,802,253,622.19(6597 contracts)
2007-9September 2007$1,923,683,336.53(5660 contracts)
2007-10October 2007$3,435,389,000.47(5507 contracts)
2007-11November 2007$10,159,802,836.50(6409 contracts)
2007-12December 2007$1,129,660,667.60(4592 contracts)
2008-1January 2008$1,139,315,018.72(4694 contracts)
2008-2February 2008$2,826,237,554.48(4990 contracts)
2008-3March 2008$2,228,037,086.01(4930 contracts)
2008-4April 2008$1,668,370,195.65(5451 contracts)
2008-5May 2008$1,740,227,603.45(7223 contracts)
2008-6June 2008$4,004,875,051.28(8133 contracts)
2008-7July 2008$5,403,023,928.22(9787 contracts)
2008-8August 2008$2,471,694,230.42(5164 contracts)
2008-9September 2008$1,718,338,580.08(5755 contracts)
2008-10October 2008$1,553,361,538.26(4987 contracts)
2008-11November 2008$3,065,380,992.98(5284 contracts)
2008-12December 2008$4,749,594,331.82(5140 contracts)
2009-1January 2009$4,090,811,655.24(4312 contracts)
2009-2February 2009$2,854,538,310.61(4278 contracts)
2009-3March 2009$2,662,884,705.50(5668 contracts)
2009-4April 2009$1,238,233,729.49(4809 contracts)
2009-5May 2009$2,215,868,650.77(6507 contracts)
2009-6June 2009$3,343,763,303.11(8271 contracts)
2009-7July 2009$10,665,300,552.85(9483 contracts)
2009-8August 2009$2,747,155,024.23(5769 contracts)
2009-9September 2009$5,392,260,149.82(5824 contracts)
2009-10October 2009$1,184,010,797.47(5444 contracts)
2009-11November 2009$1,862,375,432.90(5510 contracts)
2009-12December 2009$3,948,791,133.57(4996 contracts)
2010-1January 2010$8,755,192,817.93(4602 contracts)
2010-2February 2010$1,584,964,958.12(5108 contracts)
2010-3March 2010$4,081,357,619.55(6218 contracts)
2010-4April 2010$2,380,063,621.62(4717 contracts)
2010-5May 2010$712,712,541.55(2407 contracts)
2010-6June 2010$1,786,627,284.95(3325 contracts)
2010-7July 2010$6,265,119,805.54(5652 contracts)
2010-8August 2010$2,077,263,148.90(2264 contracts)
2010-9September 2010$3,064,268,217.59(3420 contracts)
2010-10October 2010$1,692,196,274.78(5031 contracts)
2010-11November 2010$2,777,666,764.96(5708 contracts)
2010-12December 2010$1,887,117,798.89(5225 contracts)
2011-1January 2011$1,636,543,772.04(4310 contracts)
2011-2February 2011$1,416,301,051.92(5396 contracts)
2011-3March 2011$1,677,325,704.79(6930 contracts)
2011-4April 2011$2,840,528,565.31(6460 contracts)
2011-5May 2011$2,453,998,752.21(6943 contracts)
2011-6June 2011$7,033,104,542.13(8842 contracts)
2011-7July 2011$14,245,098,728.15(10718 contracts)
2011-8August 2011$3,196,665,109.49(6986 contracts)
2011-9September 2011$2,287,445,325.45(6202 contracts)
2011-10October 2011$1,685,358,169.27(5764 contracts)
2011-11November 2011$2,208,726,805.74(5945 contracts)
2011-12December 2011$3,468,183,346.58(5067 contracts)
2012-1January 2012$3,977,204,252.56(4541 contracts)
2012-2February 2012$5,621,218,581.90(5205 contracts)
2012-3March 2012$2,125,664,235.30(6220 contracts)
2012-4April 2012$2,308,830,539.07(6469 contracts)
2012-5May 2012$3,875,860,666.34(8939 contracts)
2012-6June 2012$3,946,093,639.79(8032 contracts)
2012-7July 2012$16,955,368,977.01(9579 contracts)
2012-8August 2012$5,158,100,109.17(5473 contracts)
2012-9September 2012$2,279,393,442.56(4885 contracts)
2012-10October 2012$2,370,842,766.01(4994 contracts)
2012-11November 2012$3,397,358,467.68(4601 contracts)
2012-12December 2012$3,170,355,229.88(3732 contracts)
2013-1January 2013$1,865,908,776.70(3719 contracts)
2013-2February 2013$2,622,583,304.90(4599 contracts)
2013-3March 2013$1,645,531,795.77(5001 contracts)
2013-4April 2013$2,647,306,832.44(5668 contracts)
2013-5May 2013$3,224,909,311.54(7157 contracts)
2013-6June 2013$5,617,132,641.95(7216 contracts)
2013-7July 2013$8,018,280,320.91(9808 contracts)
2013-8August 2013$7,310,047,211.98(5393 contracts)
2013-9September 2013$1,582,033,178.58(4637 contracts)
2013-10October 2013$1,821,846,409.29(4624 contracts)
2013-11November 2013$5,333,551,243.92(4523 contracts)
2013-12December 2013$2,626,140,734.07(4046 contracts)
2014-1January 2014$1,676,756,995.37(3911 contracts)
2014-2February 2014$2,158,480,523.47(4544 contracts)
2014-3March 2014$2,144,434,928.54(5196 contracts)
2014-4April 2014$1,873,169,422.51(5260 contracts)
2014-5May 2014$1,618,532,491.29(6912 contracts)
2014-6June 2014$3,263,733,208.49(7018 contracts)
2014-7July 2014$11,546,682,493.94(8803 contracts)
2014-8August 2014$5,439,024,613.50(4835 contracts)
2014-9September 2014$3,462,407,841.91(5039 contracts)
2014-10October 2014$2,856,443,783.64(5166 contracts)
2014-11November 2014$4,462,127,025.22(4620 contracts)
2014-12December 2014$6,997,596,888.22(4523 contracts)
2015-1January 2015$1,911,841,624.91(4207 contracts)
2015-2February 2015$3,351,837,651.16(5332 contracts)
2015-3March 2015$4,656,484,512.73(5793 contracts)
2015-4April 2015$3,475,874,329.99(5893 contracts)
2015-5May 2015$3,442,707,110.62(7270 contracts)
2015-6June 2015$5,409,509,304.97(7905 contracts)
2015-7July 2015$14,128,288,977.54(9546 contracts)
2015-8August 2015$2,098,208,062.88(5151 contracts)
2015-9September 2015$3,841,586,307.71(5045 contracts)
2015-10October 2015$4,359,050,837.28(4753 contracts)
2015-11November 2015$2,803,172,284.13(4814 contracts)
2015-12December 2015$6,143,950,178.20(4139 contracts)
2016-1January 2016$2,897,811,637.23(3905 contracts)
2016-2February 2016$8,691,249,017.56(4936 contracts)
2016-3March 2016$2,804,536,261.86(5592 contracts)
2016-4April 2016$3,341,143,874.53(6490 contracts)
2016-5May 2016$4,548,359,121.96(7529 contracts)
2016-6June 2016$6,930,971,547.32(7741 contracts)
2016-7July 2016$19,863,064,450.79(8242 contracts)
2016-8August 2016$4,040,450,214.12(4959 contracts)
2016-9September 2016$2,409,921,333.77(4711 contracts)
2016-10October 2016$4,349,417,406.03(4361 contracts)
2016-11November 2016$2,647,725,029.80(4803 contracts)
2016-12December 2016$3,274,851,599.32(4152 contracts)
2017-1January 2017$1,366,474,790.23(3784 contracts)
2017-2February 2017$3,051,346,659.42(4594 contracts)
2017-3March 2017$2,496,219,859.33(5406 contracts)
2017-4April 2017$1,711,656,897.35(4919 contracts)
2017-5May 2017$2,925,629,832.58(6824 contracts)
2017-6June 2017$5,665,493,123.60(6918 contracts)
2017-7July 2017$12,098,547,077.21(8811 contracts)
2017-8August 2017$9,287,889,547.65(4996 contracts)
2017-9September 2017$5,003,002,165.95(4727 contracts)
2017-10October 2017$4,264,845,122.12(4759 contracts)
2017-11November 2017$3,160,181,795.18(4593 contracts)
2017-12December 2017$8,288,801,613.89(3913 contracts)
2018-1January 2018$9,179,948,630.59(4108 contracts)
2018-2February 2018$5,571,951,915.80(4683 contracts)
2018-3March 2018$2,679,408,537.41(5552 contracts)
2018-4April 2018$2,990,204,568.71(5549 contracts)
2018-5May 2018$3,774,875,567.14(6219 contracts)
2018-6June 2018$3,192,536,135.36(5487 contracts)
2018-7July 2018$6,310,381,619.46(8806 contracts)
2018-8August 2018$5,758,973,081.71(4456 contracts)
2018-9September 2018$2,755,650,261.63(3887 contracts)
2018-10October 2018$3,218,250,438.32(4475 contracts)
2018-11November 2018$1,473,398,518.11(4261 contracts)
2018-12December 2018$3,579,128,324.66(3168 contracts)
2019-1January 2019$1,650,921,881.05(2924 contracts)
2019-2February 2019$128,624,587.49(575 contracts)
2019-3March 2019$452,874,209.64(117 contracts)
2019-4April 2019$76,790,457.28(30 contracts)
2019-5May 2019$9,499,244.20(18 contracts)
2019-6June 2019$3,820,326.37(14 contracts)
2019-7July 2019$1,595,536.71(16 contracts)
2019-8August 2019$2,447,077.29(2 contracts)
2019-9September 2019$13,163,579.01(3 contracts)
2019-11November 2019$119,322,954.91(4 contracts)
2019-12December 2019$261,008.00(1 contracts)
2020-1January 2020$19,082,335.43(5 contracts)
2020-2February 2020$97,454,497.00(1 contracts)
2020-3March 2020$2,605,127.77(3 contracts)
2021-4April 2021$210,970,376.00(1 contracts)
2021-7July 2021$1,221,583.57(1 contracts)
2022-4April 2022$23,895,348.52(5 contracts)
2039-11November 2039$10,571.10(1 contracts)
2043-7July 2043$51,646.40(5 contracts)
2044-1January 2044$10,296.10(1 contracts)
2045-1January 2045$19,666.30(1 contracts)
2049-7July 2049$374,877.00(1 contracts)
2053-2February 2053$11,309,823.28(1 contracts)
2060-7July 2060$311,272.72(1 contracts)