Num Month/Year Total Contracts Value Number of Contracts
1900-1January 1900$58,264.85(3 contracts)
1971-4April 1971$25,333.00(1 contracts)
1971-12December 1971$17,077.76(1 contracts)
1972-1January 1972$42,207,107.31(2 contracts)
1977-12December 1977$159,814.99(1 contracts)
1978-10October 1978$43,652.92(1 contracts)
1979-7July 1979$49,794,897.36(1 contracts)
1981-1January 1981$173,492.51(1 contracts)
1981-12December 1981$21,585.45(1 contracts)
1982-2February 1982$1,839,368.95(1 contracts)
1986-1January 1986$49,566,000.00(1 contracts)
1986-2February 1986$61,360.62(1 contracts)
1986-7July 1986$57,210.00(1 contracts)
1989-6June 1989$36,468.15(1 contracts)
1990-11November 1990$153,782.20(1 contracts)
1991-1January 1991$31,400.00(2 contracts)
1991-3March 1991$3,453,530.00(1 contracts)
1991-7July 1991$42,645,000.00(1 contracts)
1991-9September 1991$1,081,176.60(1 contracts)
1992-8August 1992$15,359,410.71(1 contracts)
1992-9September 1992$7,576,300.00(1 contracts)
1993-1January 1993$13,761,139.90(1 contracts)
1993-7July 1993$1,119,474.29(1 contracts)
1993-9September 1993$6,242,400.00(1 contracts)
1993-11November 1993$8,598,506.26(1 contracts)
1994-1January 1994$350,815.00(4 contracts)
1994-6June 1994$120,000.00(1 contracts)
1994-11November 1994$14,223,049.42(1 contracts)
1995-5May 1995$43,608,426.01(30 contracts)
1995-6June 1995$3,000,000.00(1 contracts)
1995-7July 1995$131,000.00(2 contracts)
1995-8August 1995$11,201,406.85(2 contracts)
1995-9September 1995$65,000.00(1 contracts)
1995-10October 1995$7,685,682.99(1 contracts)
1995-12December 1995$4,924,056.39(1 contracts)
1996-1January 1996$26,070,493.91(4 contracts)
1996-2February 1996$2,651,840.04(3 contracts)
1996-3March 1996$14,708,050.08(1 contracts)
1996-5May 1996$13,543,473.43(2 contracts)
1996-6June 1996$10,143,589.16(2 contracts)
1996-8August 1996$3,225,300.00(1 contracts)
1996-10October 1996$89,000,000.00(1 contracts)
1996-12December 1996$390,800.00(1 contracts)
1997-1January 1997$36,293,927.51(4 contracts)
1997-3March 1997$1,214,808.92(1 contracts)
1997-6June 1997$355,025.68(1 contracts)
1997-7July 1997$5,003,341.19(2 contracts)
1997-10October 1997$2,313,960.00(3 contracts)
1997-11November 1997$76,738,212.00(4 contracts)
1997-12December 1997$1,978,329.81(8 contracts)
1998-1January 1998$43,788,915.81(3 contracts)
1998-2February 1998$21,595.75(1 contracts)
1998-3March 1998$35,328,953.41(5 contracts)
1998-4April 1998$310,991,163.45(1 contracts)
1998-5May 1998$29,235,458.10(7 contracts)
1998-6June 1998$14,618,127.53(2 contracts)
1998-7July 1998$485,238,398.09(7 contracts)
1998-8August 1998$20,809,690.49(2 contracts)
1998-10October 1998$340,000.00(1 contracts)
1998-11November 1998$6,235,770.70(1 contracts)
1999-1January 1999$5,808,032.95(3 contracts)
1999-2February 1999$44,160,368.00(1 contracts)
1999-3March 1999$1,174,407.08(2 contracts)
1999-4April 1999$8,321,934.48(2 contracts)
1999-5May 1999$15,269,099.35(1 contracts)
1999-6June 1999$3,303,595,604.45(1 contracts)
1999-7July 1999$22,192,784.22(15 contracts)
1999-8August 1999$712,985.00(1 contracts)
1999-9September 1999$44,107.00(1 contracts)
1999-10October 1999$3,680,514.00(1 contracts)
1999-11November 1999$15,818,117.31(4 contracts)
1999-12December 1999$35,580,544.44(4 contracts)
2000-1January 2000$57,988,825.11(54 contracts)
2000-2February 2000$12,500.00(1 contracts)
2000-3March 2000$1,018,600.86(5 contracts)
2000-4April 2000$4,630,985.00(6 contracts)
2000-5May 2000$744,399,931.10(7 contracts)
2000-6June 2000$81,513,297.02(4 contracts)
2000-7July 2000$72,333,857.57(24 contracts)
2000-8August 2000$21,729,621.60(8 contracts)
2000-9September 2000$22,873,169.15(3 contracts)
2000-10October 2000$54,954,148.80(5 contracts)
2000-11November 2000$48,086,681.16(7 contracts)
2000-12December 2000$180,176,953.63(6 contracts)
2001-1January 2001$25,159,599.31(9 contracts)
2001-2February 2001$193,867,039.21(6 contracts)
2001-3March 2001$17,339,362.02(7 contracts)
2001-4April 2001$24,845,100.55(5 contracts)
2001-5May 2001$12,741,480.87(2 contracts)
2001-6June 2001$329,863,065.99(11 contracts)
2001-7July 2001$101,888,613.25(31 contracts)
2001-8August 2001$149,018,964.79(27 contracts)
2001-9September 2001$36,158,592.81(15 contracts)
2001-10October 2001$74,849,610.09(15 contracts)
2001-11November 2001$33,298,089.42(19 contracts)
2001-12December 2001$48,713,418.26(15 contracts)
2002-1January 2002$110,696,854.35(36 contracts)
2002-2February 2002$690,618,491.53(14 contracts)
2002-3March 2002$493,315,843.52(11 contracts)
2002-4April 2002$219,308,884.03(27 contracts)
2002-5May 2002$161,530,758.54(21 contracts)
2002-6June 2002$441,743,400.17(25 contracts)
2002-7July 2002$161,638,315.47(43 contracts)
2002-8August 2002$61,888,441.69(21 contracts)
2002-9September 2002$82,624,526.61(31 contracts)
2002-10October 2002$84,685,367.02(37 contracts)
2002-11November 2002$43,689,126.17(28 contracts)
2002-12December 2002$125,973,866.29(22 contracts)
2003-1January 2003$140,371,403.08(23 contracts)
2003-2February 2003$82,617,205.34(23 contracts)
2003-3March 2003$87,776,932.71(28 contracts)
2003-4April 2003$356,127,829.52(56 contracts)
2003-5May 2003$144,190,167.71(66 contracts)
2003-6June 2003$225,224,450.22(27 contracts)
2003-7July 2003$1,674,959,764.33(100 contracts)
2003-8August 2003$791,339,549.38(36 contracts)
2003-9September 2003$103,943,573.00(93 contracts)
2003-10October 2003$195,999,044.94(41 contracts)
2003-11November 2003$228,103,362.03(54 contracts)
2003-12December 2003$2,163,239,255.13(54 contracts)
2004-1January 2004$246,894,304.86(45 contracts)
2004-2February 2004$113,279,808.75(85 contracts)
2004-3March 2004$207,949,835.03(56 contracts)
2004-4April 2004$1,324,508,863.63(133 contracts)
2004-5May 2004$571,317,656.22(69 contracts)
2004-6June 2004$960,736,102.13(101 contracts)
2004-7July 2004$1,445,036,135.17(216 contracts)
2004-8August 2004$640,106,356.87(126 contracts)
2004-9September 2004$173,544,865.02(84 contracts)
2004-10October 2004$323,653,448.52(139 contracts)
2004-11November 2004$593,335,517.53(97 contracts)
2004-12December 2004$2,933,664,182.83(161 contracts)
2005-1January 2005$1,507,954,769.25(1121 contracts)
2005-2February 2005$256,078,532.31(145 contracts)
2005-3March 2005$780,452,394.51(247 contracts)
2005-4April 2005$488,989,847.58(256 contracts)
2005-5May 2005$233,656,432.04(201 contracts)
2005-6June 2005$5,511,794,967.36(213 contracts)
2005-7July 2005$1,636,169,345.93(483 contracts)
2005-8August 2005$836,589,098.98(263 contracts)
2005-9September 2005$2,402,536,279.33(291 contracts)
2005-10October 2005$2,959,907,018.95(348 contracts)
2005-11November 2005$1,280,233,471.36(257 contracts)
2005-12December 2005$1,971,753,615.54(269 contracts)
2006-1January 2006$883,822,488.79(481 contracts)
2006-2February 2006$386,776,685.25(548 contracts)
2006-3March 2006$2,218,298,588.93(365 contracts)
2006-4April 2006$941,729,681.30(354 contracts)
2006-5May 2006$2,635,241,282.61(440 contracts)
2006-6June 2006$3,193,992,877.50(763 contracts)
2006-7July 2006$9,891,833,833.94(1894 contracts)
2006-8August 2006$1,451,389,622.38(1184 contracts)
2006-9September 2006$6,607,068,960.29(769 contracts)
2006-10October 2006$769,830,331.18(945 contracts)
2006-11November 2006$731,656,266.79(867 contracts)
2006-12December 2006$1,127,534,971.44(863 contracts)
2007-1January 2007$463,840,698.73(1320 contracts)
2007-2February 2007$1,269,545,903.02(1129 contracts)
2007-3March 2007$2,680,348,167.35(1549 contracts)
2007-4April 2007$4,291,510,265.55(1665 contracts)
2007-5May 2007$1,668,944,839.82(2954 contracts)
2007-6June 2007$2,660,065,490.82(4897 contracts)
2007-7July 2007$3,207,551,318.20(9624 contracts)
2007-8August 2007$1,802,077,622.19(6597 contracts)
2007-9September 2007$1,980,325,205.53(5662 contracts)
2007-10October 2007$3,435,389,000.47(5507 contracts)
2007-11November 2007$10,147,679,865.28(6407 contracts)
2007-12December 2007$1,129,660,667.60(4592 contracts)
2008-1January 2008$1,139,315,018.72(4694 contracts)
2008-2February 2008$2,826,237,554.48(4990 contracts)
2008-3March 2008$2,228,037,086.01(4930 contracts)
2008-4April 2008$1,668,370,195.65(5451 contracts)
2008-5May 2008$1,740,227,603.45(7223 contracts)
2008-6June 2008$4,004,875,051.28(8133 contracts)
2008-7July 2008$5,390,698,787.12(9787 contracts)
2008-8August 2008$2,471,321,067.50(5163 contracts)
2008-9September 2008$1,718,338,580.08(5755 contracts)
2008-10October 2008$1,553,361,538.26(4987 contracts)
2008-11November 2008$3,066,688,592.18(5285 contracts)
2008-12December 2008$4,676,720,645.92(5139 contracts)
2009-1January 2009$4,101,584,689.42(4312 contracts)
2009-2February 2009$2,833,537,445.78(4276 contracts)
2009-3March 2009$2,665,694,651.69(5668 contracts)
2009-4April 2009$1,238,233,729.49(4809 contracts)
2009-5May 2009$2,204,822,562.59(6507 contracts)
2009-6June 2009$4,300,516,459.65(8271 contracts)
2009-7July 2009$10,622,523,346.62(9482 contracts)
2009-8August 2009$2,461,995,428.91(5769 contracts)
2009-9September 2009$5,390,303,638.27(5825 contracts)
2009-10October 2009$1,184,010,797.47(5444 contracts)
2009-11November 2009$15,250,531,168.22(5511 contracts)
2009-12December 2009$3,996,662,291.08(4998 contracts)
2010-1January 2010$8,725,903,916.46(4598 contracts)
2010-2February 2010$1,584,762,580.30(5107 contracts)
2010-3March 2010$3,995,062,297.07(6218 contracts)
2010-4April 2010$2,379,980,463.65(4717 contracts)
2010-5May 2010$710,714,798.47(2406 contracts)
2010-6June 2010$1,786,627,284.95(3325 contracts)
2010-7July 2010$6,269,171,606.49(5652 contracts)
2010-8August 2010$936,159,747.03(2262 contracts)
2010-9September 2010$3,062,772,575.06(3420 contracts)
2010-10October 2010$1,692,347,994.90(5031 contracts)
2010-11November 2010$2,776,026,816.90(5708 contracts)
2010-12December 2010$3,421,563,235.53(5226 contracts)
2011-1January 2011$1,705,524,304.96(4310 contracts)
2011-2February 2011$1,404,919,162.85(5396 contracts)
2011-3March 2011$1,681,970,448.42(6931 contracts)
2011-4April 2011$2,840,418,566.08(6460 contracts)
2011-5May 2011$2,456,450,833.14(6944 contracts)
2011-6June 2011$7,033,104,542.13(8842 contracts)
2011-7July 2011$14,243,360,365.28(10717 contracts)
2011-8August 2011$3,195,579,307.63(6986 contracts)
2011-9September 2011$2,267,468,812.08(6202 contracts)
2011-10October 2011$1,691,306,352.90(5764 contracts)
2011-11November 2011$2,208,874,114.38(5946 contracts)
2011-12December 2011$3,467,617,322.66(5066 contracts)
2012-1January 2012$3,988,448,257.76(4539 contracts)
2012-2February 2012$5,621,218,581.90(5205 contracts)
2012-3March 2012$2,041,707,537.97(6218 contracts)
2012-4April 2012$4,580,658,458.86(6470 contracts)
2012-5May 2012$3,870,675,155.75(8938 contracts)
2012-6June 2012$3,968,012,978.65(8032 contracts)
2012-7July 2012$16,948,246,431.85(9579 contracts)
2012-8August 2012$5,156,303,192.24(5439 contracts)
2012-9September 2012$2,579,985,059.69(4884 contracts)
2012-10October 2012$2,389,819,136.19(4994 contracts)
2012-11November 2012$3,282,402,903.77(4597 contracts)
2012-12December 2012$3,035,811,812.85(3730 contracts)
2013-1January 2013$1,730,836,964.21(3719 contracts)
2013-2February 2013$2,639,000,758.89(4597 contracts)
2013-3March 2013$1,657,165,825.53(5003 contracts)
2013-4April 2013$2,644,660,760.53(5665 contracts)
2013-5May 2013$3,218,918,054.13(7157 contracts)
2013-6June 2013$5,735,739,584.53(7214 contracts)
2013-7July 2013$8,022,502,203.86(9796 contracts)
2013-8August 2013$7,318,551,794.81(5392 contracts)
2013-9September 2013$1,582,490,135.60(4637 contracts)
2013-10October 2013$1,811,635,076.65(4622 contracts)
2013-11November 2013$5,335,844,214.54(4525 contracts)
2013-12December 2013$2,602,728,608.95(4044 contracts)
2014-1January 2014$1,687,131,706.59(3911 contracts)
2014-2February 2014$1,972,336,670.56(4542 contracts)
2014-3March 2014$1,947,749,264.37(5201 contracts)
2014-4April 2014$1,864,346,010.51(5260 contracts)
2014-5May 2014$1,643,316,764.35(6911 contracts)
2014-6June 2014$3,247,498,832.14(7007 contracts)
2014-7July 2014$11,423,730,774.14(8803 contracts)
2014-8August 2014$5,220,766,700.59(4837 contracts)
2014-9September 2014$2,424,278,696.36(5037 contracts)
2014-10October 2014$2,887,729,698.28(5167 contracts)
2014-11November 2014$4,438,980,246.52(4624 contracts)
2014-12December 2014$6,925,805,938.28(4519 contracts)
2015-1January 2015$2,010,423,359.25(4204 contracts)
2015-2February 2015$3,322,621,496.28(5333 contracts)
2015-3March 2015$4,808,681,912.13(5789 contracts)
2015-4April 2015$3,431,828,044.69(5891 contracts)
2015-5May 2015$3,439,841,018.27(7255 contracts)
2015-6June 2015$5,127,675,100.78(7902 contracts)
2015-7July 2015$14,271,027,003.06(9543 contracts)
2015-8August 2015$2,232,233,409.01(5152 contracts)
2015-9September 2015$4,653,323,867.11(5042 contracts)
2015-10October 2015$5,274,705,752.64(4747 contracts)
2015-11November 2015$2,811,561,912.17(4818 contracts)
2015-12December 2015$6,439,182,769.00(4135 contracts)
2016-1January 2016$2,814,163,463.45(3904 contracts)
2016-2February 2016$8,626,475,589.65(4933 contracts)
2016-3March 2016$2,843,427,212.47(5590 contracts)
2016-4April 2016$3,356,660,345.82(6494 contracts)
2016-5May 2016$4,934,925,558.54(7526 contracts)
2016-6June 2016$6,670,807,386.69(7738 contracts)
2016-7July 2016$19,462,811,600.80(8248 contracts)
2016-8August 2016$4,261,352,469.02(4963 contracts)
2016-9September 2016$2,431,753,549.62(4715 contracts)
2016-10October 2016$4,232,355,530.51(4369 contracts)
2016-11November 2016$2,651,543,434.77(4813 contracts)
2016-12December 2016$3,280,535,136.51(4153 contracts)
2017-1January 2017$1,358,304,114.54(3787 contracts)
2017-2February 2017$3,079,001,309.43(4593 contracts)
2017-3March 2017$2,532,849,141.28(5400 contracts)
2017-4April 2017$1,774,482,604.97(4932 contracts)
2017-5May 2017$3,148,173,562.58(6835 contracts)
2017-6June 2017$5,599,108,351.81(6925 contracts)
2017-7July 2017$12,590,914,544.18(8799 contracts)
2017-8August 2017$9,341,089,808.32(5010 contracts)
2017-9September 2017$5,507,402,235.77(4738 contracts)
2017-10October 2017$4,236,246,140.62(4766 contracts)
2017-11November 2017$3,853,983,918.93(4558 contracts)
2017-12December 2017$8,281,946,226.13(3909 contracts)
2018-1January 2018$9,480,137,861.42(4047 contracts)
2018-2February 2018$5,467,089,295.40(4614 contracts)
2018-3March 2018$2,630,226,159.86(5546 contracts)
2018-4April 2018$2,974,856,717.75(5524 contracts)
2018-5May 2018$3,588,526,409.27(6116 contracts)
2018-6June 2018$2,976,374,568.65(5231 contracts)
2018-7July 2018$5,347,425,422.90(8030 contracts)
2018-8August 2018$5,363,017,999.42(3516 contracts)
2018-9September 2018$428,738,569.37(1259 contracts)
2018-10October 2018$274,210,998.57(208 contracts)
2018-11November 2018$3,465,880.43(35 contracts)
2018-12December 2018$487,839,309.00(19 contracts)
2019-1January 2019$11,212,874.50(16 contracts)
2019-2February 2019$1,997,938.32(6 contracts)
2019-3March 2019$3,035,527.54(3 contracts)
2019-4April 2019$11,000.00(1 contracts)
2019-5May 2019$4,868,900.83(2 contracts)
2019-6June 2019$78,000.00(2 contracts)
2019-7July 2019$392,510.89(4 contracts)
2019-8August 2019$497,420.00(1 contracts)
2019-9September 2019$346,214.00(1 contracts)
2019-11November 2019$22,186,560.00(1 contracts)
2020-1January 2020$19,064,335.43(4 contracts)
2020-2February 2020$97,454,497.00(1 contracts)
2020-3March 2020$741,163.89(1 contracts)
2039-11November 2039$10,571.10(1 contracts)
2043-7July 2043$51,646.40(5 contracts)
2044-1January 2044$10,296.10(1 contracts)
2045-1January 2045$19,666.30(1 contracts)
2049-7July 2049$374,877.00(1 contracts)
2053-2February 2053$11,309,823.28(1 contracts)
2060-7July 2060$311,272.72(1 contracts)